Aquaman: Power Wave’s queue continues to take shape with lamps installed.

The ride’s control panel has been installed.

One of two ride units has been added to the track.

Construction walls are slowly coming down around the ride.

A look at one of the wall units designed to help retain water during splashdowns.

Onlookers will have a prime view of the ride’s splashdown finale.

Crews have begun filling the ride’s retention pond up with water.

A closer look at the ride’s retention pond from the back side of the construction area.

The attraction is set to open in 2023.