Construction Updates
Aquaman: Power Wave (Update 20), Gotham City Games Midway
Aquaman: Power Wave’s completion moves closer as ride signage and an entrance portal have been erected and construction walls have come down. Small segments of work continue, including the installation of a test seat and themed pieces. Six Flags Over Texas has also closed off the Gotham City games midway in what appears to be significant refurbishment of the area.
Aquaman: Power Wave (Update 19)
Aquaman: Power Wave creeps closer to making its first test runs. Construction walls have begun coming down as the ride’s perimeter fencing is installed. Crews continue to work on the queue and station and water is now being added to the attraction’s retention pond.
Aquaman: Power Wave (Update 18)
Though delayed another year, construction continues to move forward on Aquaman: Power Wave. Shade structures and railings have been installed in the ride’s queue and station. The retention pond and walls have been built out, while the first of two ride vehicles has been installed on the track.