Mine Train & Park-Wide Updates, Rodeo & Caddo Lake Barge Paint Refreshes

Six Lanes Changes, Roller Coaster Coffee, Park Map Frames

The toll booth parking lot entrances are now equipped with gates and license plate readers. The far lane has also been reconfigured to route traffic directly into VIP parking.

Work continues on the second Roller Coaster Coffee location. A guide map frame has also appeared near the park’s entrance.

Yet another park map frame has popped up in the park’s Boomtown section.

The new hand-painted mural in the park’s Mexico section looks to be completed.

Runaway Mine Train

The area around Runaway Mine Train has been tidied up with new conduit, electrical and control panels. A train has also cycled, though it wasn’t in operation during our visit.

Rodeo & Caddo Lake Barge Paint Refreshes

Rodeo’s repaint project is ongoing as the ride remains closed.

Rodeo’s bulls have been primed and are awaiting the fine details.

The scheduled refurbishment and paint refresh of Caddo Lake Barge has begun.

The attraction is currently in the process of being sanded down and is awaiting fresh paint.

Previous
Previous

Batman: The Ride Paint Job, New Dining Locations, Various Park Projects

Next
Next

Runaway Mine Train Upgrades, Rodeo Ride Repaint, Other Park Enhancements