Pirates of Speelunker Cave
New progress has been made on the uncovered queue area of Pirates of Speelunker Cave with fresh paint on handrails.
Detail work continues on the entrance for Pirates of Speelunker Cave. The cave also now features a pirate ship situated on top.
The former exit staircase at the Pirates of Speelunker Cave site has been partially demolished.
A new photo op has been placed near Pirates of Speelunker Cave.
Aquaman: Power Wave
The newly-added turntable for Aquaman: Power Wave continues to take shape. Parts for the addition have also arrived onsite.
Looney Tunes Mall Facade Remodel
Paneling for the new Looney Tunes Mall facade is now being installed.
The buildings previous facade featured several Looney Tunes characters.
The new facade will be more modern and sleek with a lower profile.
A guest relations booth has been added next to the photo booth on the outside of Looney Tunes Mall.
Silver Star Mall/Front Gate Updates
Tons of work continues near the recently-demolished entry lanes near front gate.
Tons of work continues near the recently-demolished entry lanes near front gate.
A couple of trees and the Silver Star Carousel Stage tech booth have been removed from Silver Star Mall.
Detail work is taking place on the building structure for Silver Star Carousel. Rotten wood has been replaced and is in the process of being repainted.
The faux proscenium arch that was once in place has also been removed, opening up views for the Silver Star Carousel.
Miscellaneous Building Upgrades
The new roof for the Buffalo Trading Post has been fully installed.
Structures near Rodeo where Back Porch Stage once stood have been repainted.
This dining structure near Oil Derrick has been repainted. The Lone Star Twisters sign has also been removed.