Aquaman: Power Wave (Update 7)

The second spike and track pieces of Aquaman: Power Wave have been installed.

All Aquaman: Power Wave track pieces are now installed.

Work continues on the trough-like structure that will hold the attraction’s splash down.

Aquaman: Power Wave is in close quarters with Pandemonium.

A look at the ride’s future station. More concrete has been poured but substantial work still awaits.

A look at the newly-installed spike from the park’s Bugs Bunny Boomtown section.

New JB’s Smokehouse BBQ Dining Area

Walls and a roof have been installed for the new JB’s Smokehouse BBQ indoor eating area.

Work has paused for now so that the dining location can maximize its seating arrangements during Spring Break.