The Joker (Update 5)

A look at Joker from outside the park.

The main ride structure is really nearing completion.

Ride cars have been installed in the station.

More concrete has been poured for walkways.

Another look at construction on the re-purposed shopping strip.

A closer look at the lift hill and first drop.

The Joker carries a stunning paint scheme.

Previous
Previous

The Joker (Update 6)

Next
Next

The Joker (Update 4)